PREPARED BY: James Blyth (Jacobs New Zealand Ltd.)
The sole purpose of this report and the associated services performed by Jacobs is to develop an integrated hydrological and contaminant model for the Te Awarua-o-Porirua (TAoP) catchment, in accordance with…
This document outlines the impacts, benefits, and mitigation measures on transport regarding the Eastern Bays Shared Path project.
This document provides a summary of the various alternatives that have been considered and assessed throughout the development of the Eastern Bays Shared Path project.
This document contains the assessment of a single survey, undertaken in December 2018, to confirm the presence and extent of seagrass at three locations to gain preliminary information on its…
This document contains the report which monitors the air discharge of the Resene factory extraction manufacturing facility in Upper Hutt, undertaken in January 2019. The objective of this report is…